The existing property was completely destroyed at first floor level including the roof. The ground floor area was ruined by the smoke from the fire and water penetration.

The project involved a complete new roof structure, installation of a concrete beam and block floor, internal partitions throughout. New plumbing/electric installations including bathrooms, ensuites and underfloor heating. Large oak frame feature window with triple glazing installed to main bedroom and lower lounge area. Special purpose made doors and joinery items. All floor and wall tiling, wood floors and decoration.

The clients were extremely pleased with the final standard of the workmanship and finish of all interior and exterior aspects of the project.